Ok well I have been a member on this forum for awhile so I figured it was time to post some build pictures. I still have some work to do but I am slowly getting there. Cage goes in January 21!
Here she is when I picked here up


Engine looks good, replaced the timing belt, water pump and all hoses. Along with adjusting the valves

Yep its a four door

Suspension install


As she sits now

I am currently taking out the interior getting it ready for the cage in January 21! I picked up the car from dpmotorwerks with a bent steering rack and some electrical problems. Fixed all of those problems and now she runs like a champ. The car will make its debut at VIR in february. Can’t wait.
-Brandon

:dry: :blink: :laugh: :woohoo: :unsure:
















